About the project
In the immediate vicinity of the A2 (exit Bielefeld – center), but still centrally connected to the city of Bielefeld, the property team planned and developed a modern logistics center with approx. 21.000 m². On the property with approx. 21,000 m², an approx. 3,000 m² production facility for the handling of express consignments and a 950 m² administrative building was built.
The facility was equipped with a state-of-the-art sorting facility capable of processing more than 3,500 packages per hour.
In addition, the new building has two so-called PuD fingers for the direct loading and unloading of at the same time 80 local transport vehicles. When planning the building, the use of energy-saving materials was emphasized and, for example, modern LED technology was used for the entire lighting.
The demolition of the existing building began on April 2019. Construction startet in June 2019 and completion and commissioning to DHL Express was already completed at the end of november 2019.